Server:Apache...
The main IP address: 217.160.223.80,Your server Germany,Karlsruhe ISP:1&1 Internet AG TLD:uk CountryCode:DE
The description :the first construction disputes consultants on the web!...
This report updates in 29-Sep-2018
Geo IP provides you such as latitude, longitude and ISP (Internet Service Provider) etc. informations. Our GeoIP service found where is host delay-analysis.co.uk. Currently, hosted in Germany and its service provider is 1&1 Internet AG .
Latitude: | 49.004718780518 |
Longitude: | 8.3858299255371 |
Country: | Germany (DE) |
City: | Karlsruhe |
Region: | Baden-Wurttemberg |
ISP: | 1&1 Internet AG |
HTTP Header information is a part of HTTP protocol that a user's browser sends to called Apache containing the details of what the browser wants and will accept back from the web server.
Content-Length: | 6313 |
Content-Encoding: | gzip |
Vary: | Accept-Encoding |
Keep-Alive: | timeout=2, max=100 |
Server: | Apache |
Connection: | Keep-Alive |
Link: | |
Date: | Fri, 28 Sep 2018 19:18:07 GMT |
Content-Type: | text/html; charset=UTF-8 |
soa: | ns1074.ui-dns.org. hostmaster.1and1.co.uk. 2016042800 28800 7200 604800 300 |
ns: | ns1074.ui-dns.de. ns1074.ui-dns.biz. ns1074.ui-dns.org. ns1074.ui-dns.com. |
ipv4: | IP:217.160.223.80 ASN:8560 OWNER:ONEANDONE-AS Brauerstrasse 48, DE Country:DE |
mx: | MX preference = 10, mail exchanger = mx01.1and1.co.uk. MX preference = 10, mail exchanger = mx00.1and1.co.uk. |
the first construction disputes consultants on the web! -- home -- home recent instructions profiles articles terms legal news client area home -- morris associates are specialists in construction disputes resolution with a particular specialisation in forensic delay analysis. latest news on 30 june 2008, richard morris joined global top-ten quantity surveying and dispute resolution consultancy systech international as head of expert services. morris associates is not taking on any new instructions as a consequence. we particularly provide the following services to client organisations, contractors, subcontractors, solicitors, insolvency practitioners and professional practices in connection with contractual and financial problems on construction and civil engineering projects both in the united kingdom and internationally: provision of staff on a regular and continuing basis to review progress, correspondence and records on projects for potential and actual contractual difficulties and disputes and to resolve any such difficulties quickly, efficiently and with the most economical result both in terms of time and money for clients; preparation and negotiation of contracts, subcontracts, warranties and guarantees; provision of contractual advice as to the basis and likely success of claims; preparation and negotiation of claims and counterclaims using project management critical path constraint and forensic delay analysis techniques to simulate the effects, both in terms of time and money, of individual events; defence against submitted claims from contractors and subcontractors; professional and technical support in litigation and arbitration proceedings; adjudication ‘rapid response’ teams to defend adjudication proceedings; acting as expert witness on programme matters such as extensions of time, delays and disruption; acting as arbitrator; acting as adjudicator; and alternative dispute resolution (adr) services. all documents prepared for these services are produced to a very high standard of content and presentation using state-of-the-art word-processing, spreadsheet, project management/planning and database computer software. such documents are prepared from the outset to be sufficiently detailed and to such a format as to be able to form the basis of pleadings in arbitration or litigation if required. there is then limited need for further research and documentation thus representing the most cost-effective service to clients. forensic or retrospective delay analysis may take the form of time impact analysis, collapsed as-built analysis, impacted as-planned analysis or as-planned -v- as-built analysis, depending upon the level of factual material available. turning to the question of costs, our services are provided at rates which are flexible and on terms that always lead to substantial savings over other, larger firms of consultants. our current client base includes, amongst others, nhs trusts, solicitors, subcontractors and top-twenty contractors who have been providing a regular flow of repeat business due to the commitment and quality of service we offer. richard morris has been mentioned in building magazine – an article by tony bingham describes richard as: “one of these up-and-coming people who… know a thing or two about construction dispute resolution” for some examples and details of our services, please visit our recent instructions page. click here if you need our assistance or just want to know more about us. share this: google linkedin twitter uk date/time friday 28th of september 2018, 08:18 pm navigation home recent instructions profiles richard h. morris articles the management of project information terms international terms legal news client area search this site privacy & cookies: this site uses cookies. by continuing to use this website, you agree to their use. to find out more, including how to control cookies, see here: cookie policy copyright © entries (rss) and comments (rss) .
http://www.morris-associates.net/?share=google-plus-1
http://www.morris-associates.net/articles/
http://www.morris-associates.net/?share=linkedin
http://www.morris-associates.net/profiles/richard-h-morris
http://www.morris-associates.net/recent
http://www.morris-associates.net/profiles/
http://www.morris-associates.net/client-area/
http://www.morris-associates.net/contacts/
http://www.morris-associates.net/recent/
http://www.morris-associates.net/?share=twitter
http://www.morris-associates.net/comments/feed/
http://www.morris-associates.net/feed/
http://www.morris-associates.net/profiles/richard-h-morris/
http://www.morris-associates.net/articles/the-management-of-project-information/
http://www.morris-associates.net/terms/international-terms/
building.co.uk
tonybingham.co.uk
Whois is a protocol that is access to registering information. You can reach when the website was registered, when it will be expire, what is contact details of the site with the following informations. In a nutshell, it includes these informations;
Error for "delay-analysis.co.uk".
the WHOIS query quota for 2600:3c03:0000:0000:f03c:91ff:feae:779d has been exceeded
and will be replenished in 413 seconds
WHOIS lookup made at 21:54:54 16-Oct-2017
--
This WHOIS information is provided for free by Nominet UK the central registry
for .uk domain names. This information and the .uk WHOIS are:
Copyright Nominet UK 1996 - 2017.
You may not access the .uk WHOIS or use any data from it except as permitted
by the terms of use available in full at http://www.nominet.uk/whoisterms,
which includes restrictions on: (A) use of the data for advertising, or its
repackaging, recompilation, redistribution or reuse (B) obscuring, removing
or hiding any or all of this notice and (C) exceeding query rate or volume
limits. The data is provided on an 'as-is' basis and may lag behind the
register. Access may be withdrawn or restricted at any time.
REFERRER http://www.nominet.org.uk
REGISTRAR Nominet UK
SERVERS
SERVER co.uk.whois-servers.net
ARGS delay-analysis.co.uk
PORT 43
TYPE domain
DISCLAIMER
This WHOIS information is provided for free by Nominet UK the central registry
for .uk domain names. This information and the .uk WHOIS are:
Copyright Nominet UK 1996 - 2017.
You may not access the .uk WHOIS or use any data from it except as permitted
by the terms of use available in full at http://www.nominet.uk/whoisterms,
which includes restrictions on: (A) use of the data for advertising, or its
repackaging, recompilation, redistribution or reuse (B) obscuring, removing
or hiding any or all of this notice and (C) exceeding query rate or volume
limits. The data is provided on an 'as-is' basis and may lag behind the
register. Access may be withdrawn or restricted at any time.
REGISTERED no
DOMAIN
NAME delay-analysis.co.uk
NSERVER
NS60.1AND1.CO.UK 217.160.81.169
NS59.1AND1.CO.UK 217.160.80.169
The following list shows you to spelling mistakes possible of the internet users for the website searched .